Prophix Cloud Release Notes
Winter 2019
March 2019
Release notes describe the enhancements and bug fixes contained in new releases and maintenance releases.
Tip: You can use the search feature in the help to find Prophix Support Desk ticket numbers across all release notes.
Planned End of support for Internet Explorer 11
On March 11, 2019, Prophix announced it will remove support for Internet Explorer 11 (IE11) effective December 31, 2019.
If you are currently using IE 11, we recommend switching to Edge or another modern browser such as Google Chrome. Microsoft Edge is the best choice if a Microsoft browser must be used at your organization.
After the End of Support date, functionality in Prophix may not work in IE11, and no minor bugs or cosmetic issues will be fixed for IE11.
Why is Prophix removing support for IE11?
Microsoft released the Edge browser as a replacement for IE11 in 2015 as part of it's Windows 10 operating system. As a result, IE11 no longer receives major updates, and lacks many technical features to support modern web applications. IE11 is considered a legacy browser, with much slower JavaScript and rendering performance than modern browsers like Google Chrome and Microsoft Edge.
Prophix strives to deliver products that meet our customers’ needs. The increasing gap between IE11 and all other browsers has meant that we must expend considerable effort to avoid and fix defects that only appear in IE11. It limits our technology choices and ability to deliver the reliability and functionality our customers expect.
What's new
The newest features in Prophix are as follows.
Access
- Prophix support for Single Sign On (SSO) with SAML 2.0 authentication, now includes ADFS 4.0 and Azure AD.
Ad Hoc Analysis
-
You can now "drill through" to a detailed planning cube from a data view or template.
Announcements Studio
- Create and manage the Announcements that appear to users in their dashboard.
Auditing
- Using the Object History feature, administrators can now track the changes made to users, roles, and groups in Security Manager.
Dashboard Studio
- In chart tiles, the series limit has been increased from 12 to 26 for column, bar, line, and combo charts (for pie and funnel charts the limit remains at seven).
- Dashboard charts animation has been removed.
- The color palettes for charts have been revised and the number of colors in a palette has been increased from 9 to 12.
Data Connector
- Previously, all administrators and advanced users could see source data in certain previews. An additional layer of data security has been added to the Preview option to restrict access to source data.
Detailed Planning Manager
- You can now duplicate an existing scenario in order to re-use its resources and some or all of its features, including actions and attribute values.
Detailed Planning Schedules
- Schedules now support the Windows Clipboard. When you Copy data inside an external application such as Excel, you can Paste the data into a schedule.
Document Explorer
- Your preferred settings, such as list view/tile view, sort direction, and column selection, are now automatically saved between sessions.
Drill Across Designer
- Drill Across Designer has a new, improved user interface.
Process Manager
- The Export Dimension process can be used to extract a dimension and save it to a file or database.
Prophix for Office 365
- Prophix for Office 365 Excel is now available. To learn more, contact your Prophix Customer Account Manager.
Report Binder
- You can now add multiples files at once to a report binder.
Template Studio
- You can now add charts to your templates.
- Designers can set the default for Auto Refresh for a data-entry template.
Templates
- Linked templates now open in their Template default start mode.
-
In the Pages drawer, in addition to the list view, you can now view page dimensions as a hierarchy:
Resolved issues
Note that the current build is always cumulative: it contains all previous patches.
Released | Ticket number | Area | Description |
---|---|---|---|
March | 66446 | DP Schedules | If there are no objects in a schedule and a new object is added, the format of the Total row is incorrect. |
March | 66601 | DP Schedules | A user with only partial access to the Organization dimension was unable to save when entering data to a schedule in a workflow. |
March | 70227 | DP Schedules | The calculation columns ignored changes made to the Start Period and End Period attributes. |
March | 69604 | DP Schedules | If a calculation's first or second column contained a single-member named set, when the schedule was saved an "Invalid Data" message appeared. |
March | 80575 | DP Schedules | Saving a schedule to Excel changed the value in a Date attribute. |
March | 65445 | DPM | When Posting to a finance cube, no records were posted if the Time dimension mapping used similar leaf members. |
March | 67839, 64633, 56168 | DPM | When a DP Import Process failed because DPM was locked, Process Manager displayed a misleading error message instead of the normal error message for this situation. |
March | 71101 | DPM | If a Lookup calculation referenced items in a List attribute and the items were deleted, errors occurred. |
March | 80690 | DPM | Duplicating a calculation that was referenced by other calculations caused the references to switch to the new calculation. |
March | 66921 | Model Manager | Time dimension members were created with an incorrect Start Date. |
March | 68018 | Model Manager | Dimension changes were not retained after publishing. |
March | 70373 | Model Manager | Changes made to the Account dimension were not visible after running the Publish process. |
March | 67908, 68874 | Model Manager | If the Default member was set to a member other than All, running the Update Cube process reset the Default member to All. |
March | 80262 | Model Manager | Editing a parent member's Key and then saving resulted in an error and the inability to re-open the dimension. |
March | 70679 | Model Manager | Publishing changed the display format of a custom member property of type Date. |
March | 80934 | Model Manager | After selecting the GET DATA method for a shared dimension, in Source Cube Members, instead of Current Member, Not Defined appeared. |
March | 80776, 88021 | Model Manager | Changing the time zone changed the Start Date and End Date in the Time dimension. |
March | 62723 | Template Studio | Negative and positive percentage (%) symbols were not lining up. |
March | 70829, 80619 | Template Studio | If a cell contained a formula and the cell's formatting was set to Percentage, the cell value appeared as NaN. |
March | 80624 | Template Studio | When editing a formula, Undo did not work correctly. |
March | 61180 | Templates | Enabling the Exclude missing rows option hid the chart. |
March | 64596 | Templates | Italic format was not applied to a cell if the cell had conditional formatting that specified italic format. |
March | 70411 | Templates | Could not paste a negative number if the target cell formatting was set to Accounting. |
March | 67814 | Templates | Pasting to a range of cells only pasted to the first cell of the selection. |
March | 80818 | Templates | Launching a linked template that included Row Notes from a dashboard caused the error An item with the same key has already been added using Linked Template in Dashboards. |
March | 66901, 69157 | Process Manager | A scheduled process could not be deleted if the user who created it had been removed from Prophix. |
March | 67842 | Process Manager | In Procedural Calculation processes, under Procedural Calculations to Execute, the selection check boxes behaved inconsistently. |
March | 69802 | Process Manager | In a mapping table, typing a number with leading zeroes and then moving to another cell would cause the leading zeroes to disappear. |
March | 67643 | Process Manager | In an Infoflex process with a large number of member combinations, clicking Check Impact showed 1 or 0 for the number of combinations. |
March | 63982 | Process Manager | In an Infoflex process, when using named sets for the Time dimension, in the Source data aggregation option drop-down, Copy between time members was not available. |
March | 66734 | Process Manager | In an Infoflex process, when using named sets for the Version dimension, in the Source data aggregation option drop-down, Copy between time members was not available. |
March | 80452 | Process Manager | The Native SQL Data process would timeout if running a Stored Procedure that took 20 minutes. |
March | 67597 | Security Manager | Though a user's access to a cube was revoked, the user was still able to view the cube's data in Ad Hoc Analysis. |
March | 68171 | Security Manager | When importing users from an external source under a Windows-Authentication-only environment, the message listing the required fields left out UserID. |
March | 66457, 70715, 70739, 70818 | Security Manager | Unable to export Security Audit Report as Excel file. |
March | 68395 | Drill Across | If the grid had more than 20 columns, the column headers were shown but not the data rows. |
March | 67371, 66765, 67747 | Drill Across | In Drill Across, if the screen Zoom was set to a percentage other 100, the screen jittered. |
March | 70147, 70207, 71204 | Drill Across | An error occurred after switching from BASE to YTD, right-clicking a member combination, and selecting Drill Across. |
March | 81481 | Drill Across | Depending on the number of records returned, timeout errors occurred. |
March | 68608 | Drill Across | Numeric formatting for commas and decimals was inconsistent. |
March | 69961 | Line Item Schedules | The Description header failed to appear in the schedule. |
March | 68101 | Workflow | The automatic submission of overdue tasks was not working. |
March | 68103, 68237, 71157 | Workflow | Enabling the Approvers can edit option resulted in an error when an Approver clicked a workflow task. |
March | 56554, 60196, 62795, 60193 | Dashboards | While running a dashboard, clicking data in a chart did not drill down to the expected account. |